CRAC / CRAH Sizing Reference

Sensible heat ratio, derating factors, redundancy modes and target utilization guidance for precision air conditioning sizing. Use alongside the CRAC / CRAH Sizing tool.

Last updated: June 2026

Terms

CRACComputer Room Air Conditioner
The specialized air-conditioning unit that cools a server room.
CRAHComputer Room Air Handler
Similar job to a CRAC unit — it cools a server room — but instead of cooling the air itself, it uses chilled water piped in from elsewhere in the building.

Sensible Heat Ratio (SHR)

CRAC/CRAH nameplate capacity is usually total capacity (sensible + latent). Server rooms have almost no latent (humidity) load, so only the sensible portion is useful for IT cooling — the SHR tells you what fraction that is.

Room typeTypical SHRNotes
Dedicated server/IT room, no occupants0.95 – 1.00Almost entirely sensible load — IT equipment doesn't add humidity
Mixed-use technical room, light staffing0.90 – 0.95Small latent contribution from people and outside-air infiltration
Comfort-cooling-rated unit used for IT space0.70 – 0.85Standard comfort AC nameplate SHR — oversized for sensible-only IT load if used as-is

Rule of thumb: a 12.5 kW nameplate unit at SHR 0.95 delivers about 11.9 kW of usable sensible cooling for IT load.

Unit Derating Factors

FactorTypical deratingWhy
Dirty/aging filters5 – 10 %Reduced airflow across the coil cuts effective capacity
Altitude (1 500 – 2 000 m)8 – 12 %Lower air density reduces both airflow mass and heat-transfer effectiveness
High condenser ambient (DX units)10 – 20 %Hot outdoor/plant-room ambient reduces compressor capacity on warm days
Combined general allowance (default)10 %Reasonable starting planning value when site-specific data isn't available yet

Redundancy Modes

ModeUnits needed for X requiredTypical use
NExactly enough units, no spareNon-critical / lab spaces only — any single failure causes a cooling shortfall
N+1One additional unit beyond the calculated minimumStandard for most server/technical rooms — tolerates one unit failure or maintenance
2NTwo fully independent sets, each independently sized for 100 % of loadMission-critical facilities — tolerates loss of an entire cooling path

Target Utilization

Running units near 100% of rated capacity leaves no headroom for derating drift, fouling or hot days. Most designs target a working capacity below nameplate.

Target utilizationWhen to use
70 %Conservative — older units, harsh ambient conditions, or limited maintenance access
80 % (common default)Balanced planning margin for most new installations
90 %+Tight retrofit constraints with strong confidence in nameplate data — leaves little margin

Frequently Asked Questions

What's the difference between CRAC and CRAH?

CRAC (Computer Room Air Conditioner) units have their own integrated direct-expansion (DX) refrigeration circuit and condenser. CRAH (Computer Room Air Handler) units instead use chilled water from a central plant, with no on-board compressor. CRAH units are typically more efficient at scale but depend entirely on the chilled-water plant's reliability.

Why does sensible heat ratio matter so much for IT cooling?

A unit's total nameplate capacity includes both sensible (temperature) and latent (humidity/dehumidification) cooling. Server rooms generate almost no latent load, so only the sensible fraction does useful work. Using total nameplate capacity instead of sensible capacity overstates how much real IT load a unit can handle — sometimes by 15–30%.

How do I choose between N+1 and 2N?

N+1 protects against a single unit failure or planned maintenance — appropriate for most business-critical but not life-safety-critical IT spaces. 2N protects against loss of an entire cooling path (e.g. one chilled-water loop or one electrical distribution branch feeding multiple units) — reserved for mission-critical facilities where even a brief multi-unit outage is unacceptable.

Should I size for today's load or future growth?

Both, separately. Size the immediate requirement accurately using current/near-term load, then add the safety margin and redundancy mode on top. Don't inflate today's load estimate to "leave room for growth" — that distorts the SHR/derating math. Plan a phased capacity-add instead if significant growth is expected.