GPU & Workload
GPU deployment
Scope: a handful of GPU servers in a server room up to a ~20-rack GPU cluster — not gigawatt-campus hyperscale.
= 32 GPUs total
GPUs rarely sustain 100% during training, but AI inference workloads commonly run near-constant. Overhead ~1.8× covers the non-GPU node power — CPUs, NVLink, RAM, PSU losses — an 8×H100 node draws closer to 10 kW than the raw 5.6 kW of GPU wattage alone.
Facility & Density
PUE and rack layout
1.3–1.5 is typical air-cooled; ~1.15 is typical for direct liquid cooling. Measure yours with the PUE Calculator.
Electricity
Running cost
Your all-in business rate incl. taxes & grid fees — it's on your electricity bill. Same rate logic as the Energy Cost Calculator.
Not a hardware-pricing tool
This calculates power, cooling and running cost — not GPU purchase price. GPU model presets set typical wattage (TDP) only; hardware prices change too fast and depend on vendor and contract, so enter your own figures elsewhere for a purchase-cost comparison.